JupiteX Get the app
Social Issues31 Oct 2026 · about 7 min

The great Indian railway upgrade: How much has really changed for passengers?

The brief

The Amrit Bharat Station Scheme is a nationwide programme to redevelop railway stations. Its purpose is to make stations more accessible, useful and connected to their surrounding cities. The scheme looks beyond attractive buildings. It focuses on the facilities passengers depend on during ordinary journeys. Planned improvements include station buildings, waiting halls, toilets, seating and drinking-water facilities. The programme also covers platforms, foot overbridges, lifts, escalators and passenger information systems. Access for passengers with disabilities and spaces for local products under One Station One Product are included. Better links with other transport modes are also part of the plan. The scheme must serve stations with very different needs. A busy city terminal may require crowd-handling space and complex interchange routes. A smaller station may urgently need safe crossings, clean toilets, water and seating. The article says a uniform-looking makeover cannot replace facilities suited to each station's passengers.

01

What is the Amrit Bharat Station Scheme, and what kinds of passenger facilities is it meant to improve?

The Amrit Bharat Station Scheme is a nationwide programme to redevelop railway stations. Its purpose is to make stations more accessible, useful and connected to their surrounding cities. The scheme looks beyond attractive buildings. It focuses on the facilities passengers depend on during ordinary journeys.

Planned improvements include station buildings, waiting halls, toilets, seating and drinking-water facilities. The programme also covers platforms, foot overbridges, lifts, escalators and passenger information systems. Access for passengers with disabilities and spaces for local products under One Station One Product are included. Better links with other transport modes are also part of the plan.

The scheme must serve stations with very different needs. A busy city terminal may require crowd-handling space and complex interchange routes. A smaller station may urgently need safe crossings, clean toilets, water and seating. The article says a uniform-looking makeover cannot replace facilities suited to each station's passengers.

02

How large is the railway upgrade: how many stations have been identified for redevelopment, and how many were completed by December 2025?

Indian Railways' station upgrade is operating at a very large scale. Under the Amrit Bharat Station Scheme, 1,337 stations had been identified for redevelopment by December 2025. The programme is intended to change buildings, platforms, passenger facilities and connections with surrounding cities. It therefore covers far more than a small set of flagship terminals.

Progress was uneven at that point. Work had been completed at 155 stations by December 2025. The difference between the stations identified and those completed reflects the size and complexity of the programme. Stations must continue handling passengers and trains while construction proceeds, which limits how quickly work can be done.

The railway minister, Ashwini Vaishnaw, cited construction near operational tracks, utility shifting, statutory clearances and safety restrictions as factors affecting schedules. The figures show substantial ambition, but also that many stations remained in the redevelopment pipeline. Maintaining existing facilities during this transition remains essential.

03

What are Vande Bharat trains, and why have increasing numbers of passengers chosen to use them?

Vande Bharat trains are a prominent part of Indian Railways' push towards more contemporary travel. They offer modern coaches, improved passenger amenities and faster intercity journeys. Their appeal is especially clear for people travelling regularly for work, education, business or family commitments. A shorter, more comfortable journey can make frequent travel less tiring.

Passenger numbers provide a concrete example. Nearly 3.98 crore people travelled on Vande Bharat services in 2025-26, compared with 2.97 crore in 2024-25. That was an increase of about 34%. Since its introduction, the service had carried more than 9.1 crore passengers through approximately one lakh trips. A sleeper version launched in January 2026 also reported occupancy above 100% in its first three months.

These figures suggest that passengers respond to services offering a compelling mix of speed, comfort and amenities. The article cautions that premium trains cannot be the only measure of progress. Indian Railways still serves passengers with very different budgets and travel needs.

04

What did the CAG audit find about toilets, drinking water and other basic amenities at railway stations?

The article presents audits as evidence that railway modernisation has not solved everyday service problems. It says government audits continue to flag gaps in basic passenger amenities, onboard cleanliness and maintenance. These concerns include the basic conditions passengers encounter during routine journeys, rather than only the appearance of newly redeveloped stations.

The supplied text does not give a detailed CAG table or specific audit findings about toilets, drinking water or individual stations. It mentions toilets and safe drinking water as important tests of passenger experience, while separately stating that audits have identified gaps in basic amenities. Therefore, the article supports a broad finding, not precise CAG statistics.

That distinction matters because new buildings and trains can create a modern impression while ordinary services remain unreliable. The article argues that the transformation must be felt in the quality of service passengers receive. Clean facilities, usable amenities and proper maintenance are central to that test.

05

What happens to passengers' journeys when stations look modern but toilets, water, cleanliness, crowd management or train punctuality remain poor?

Passenger experience is measured during the journey, not just by what a station looks like. If platforms are difficult to manage, toilets are unclean, water is unsafe, coaches are poorly maintained or trains run late, modern construction has limited practical value. The article calls these everyday conditions the real test of railway modernisation.

For example, a redeveloped station may have a new facade and improved buildings, yet passengers could still struggle with crowded platforms, weak passenger information or inadequate facilities. Similarly, a newer train may offer comfortable seating, but the broader network still serves people who depend on ordinary services. The mechanism is simple: visible infrastructure shapes first impressions, while reliable amenities shape the actual journey.

The article says government audits continue to flag gaps in amenities, cleanliness and maintenance. This contrast creates a risk of uneven modernisation. Future investment must therefore combine construction with daily upkeep, service quality, crowd management and punctual operations across the network.

06

How can Indian Railways improve busy stations while trains continue to operate and construction is taking place around active tracks?

Improving a busy station while trains continue to run requires construction to fit around railway operations. The work cannot simply treat the station as an empty building site. Passenger movement, train movements and safety must remain protected throughout the redevelopment. This makes planning and coordination as important as the design itself.

The article identifies several practical constraints. Construction near operational tracks requires restrictions to protect passengers and trains. Utilities may need to be shifted, and statutory clearances must be obtained. These tasks can affect project schedules. Work also has to accommodate the crowds, platforms and interchange movements already handled by major terminals.

The railway minister, Ashwini Vaishnaw, cited the difficulty of carrying out major construction without shutting busy stations. A workable approach therefore involves managing construction around live operations and maintaining existing facilities during the transition. The article suggests that infrastructure transformation takes time, so service quality cannot be postponed until projects are finished.

07

Why does maintaining everyday services matter as much as building new railway infrastructure in a network used by millions of people?

Everyday maintenance matters because Indian Railways is used by millions of people with varied budgets and travel needs. A station's value is not limited to its building or facade. Passengers need manageable platforms, clean toilets, safe drinking water, maintained coaches and trains that arrive on time. These basic services determine whether modernisation improves real journeys.

The article contrasts large investments with continuing audit concerns about amenities, cleanliness and maintenance. Vande Bharat demonstrates that passengers welcome modern coaches, comfort and faster travel. Yet premium services represent only one part of a network. A smaller station may need dependable water, seating, accessible toilets and a safe platform crossing more urgently than a dramatic visual makeover.

Maintaining existing services also matters while redevelopment continues. Construction can take time because trains keep running, tracks remain active and clearances or utility work may delay projects. The article's central implication is that infrastructure and daily service must improve together, not one after the other.

This brief was written by AI from the original reporting and checked by other models. Names, figures and quotes come from the source; read it for full context.

Read more in the JupiteX app

Pulse is free. New stories every 4 hours, each one broken into the questions that explain it.

Or read more news on the web